Greenscape Capital Group Inc.
 
 
 
   

MAKING IT GREEN

 

Greenscape's Denver green parking facility incorporates a number of environmentally responsible features in the design and operations. Included in this is the use of wind and solar power generation, geothermal heating and cooling, LED lighting and LEED Gold building standards. Greenscape and the Denver project's operating partner, ProPark, are working with industry-leading suppliers of these green products for incorporation into the construction of the Denver parking facility; a facility that is being built as the world's greenest parking operation. As the project progresses, we will continue to highlight key green features and suppliers for the facility on this page.

Windspire Energy, formerly Mariah Power, has been selected as the wind energy supplier for the Denver parking facility.   READ FULL DESCRIPTION

 

 

Evergreen Solar has been selected as the solar energy supplier for the
Denver parking facility.   READ FULL DESCRIPTION

 

 

EV Juice Bars (electric vehicle charging stations) will be installed at the Denver parking facility. Free "juice" will be available to all EV drivers .   READ FULL DESCRIPTION

 

 

Geothermal Heating & Cooling

Geothermal systems will be used to heat and cool the indoor buildings at the facility. Seven boreholes were drilled onsite, each to a depth of approximately 300 feet. The boreholes were drilled with a 4.75" bit, and loaded with 1" diameter high density polyethylene geo loop, and then grouted with thermal enhanced grout. During the heating season, the circulated fluid temperature will drop and during the cooling season, the loop field temperature will be increased. Typical temperatures of the loop field will range between 40 - 75 degrees Fahrenheit, depending on weather.

 

 

 
   
     
HOME       PORTFOLIO       ENERGY RETROFITTING        MEDIA CENTER        INVESTORS        CONTACT      LEGAL      SITE MAP
 
   
Investor Relations by Kin Communications
 
   
webSITE by New Design Now